Handle changed cash-flow conditions
A changed-condition model has one recurrence before a specified point and another recurrence after it. Calculate the first stage, carry its change-point balance into the second stage, and replace only the stated condition
- Split at the change point Apply the first set of conditions up to the change point, then use the resulting balance as the starting value for the second stage \(\displaystyle V_0\longrightarrow V_1\longrightarrow\cdots\longrightarrow V_c\)
- Carry the exact seam balance Keep the balance at the change point exact when it becomes the starting value for the new conditions \(\displaystyle V_c=6537.5\quad\Rightarrow\quad V_{c+1}=1.05V_c+700\)
- Change only the named condition If only the cash flow changes, keep the period multiplier and the financial role unchanged \(\displaystyle R_2=R_1=1.05,\quad D_1=500,\quad D_2=700\)
- Round at the requested boundary Round the final displayed balance after the stage-two calculations rather than feeding a rounded seam into the next stage \(\displaystyle V_4=8642.59375\rightarrow8642.59\)
- Define the comparison intervention Name which rate, cash flow, financial role and horizon are held fixed in each comparison. Restoring an old rate while retaining a newly solved payment is not the same counterfactual as restoring every old setting
- Match technology to the task A recurrence table or spreadsheet exposes changing conditions and exact seams. A TVM solver is suitable for one constant-rate, constant-payment stage after its viewpoint, frequency and END/BEGIN convention are stated
Worked example
A balance starts at $3000 and earns 4% annually. It receives a $250 addition at the end of each of the first two years, then a $400 addition at the end of each of the next two years. Find the balance at the end of year 4.
- \(\displaystyle R=1+\frac{4}{100}=1.04\)The annual rate gives a multiplier of 1.04 for both stages
- \(\displaystyle V_1=1.04\times3000+250=3370,\quad V_2=1.04\times3370+250=3754.8\)Use the first addition for both transitions before the condition changes
- \(\displaystyle V_3=1.04\times3754.8+400=4304.992\)The third transition starts from the exact balance at the change point and uses the new addition
- \(\displaystyle V_4=1.04\times4304.992+400=4877.19168\rightarrow4877.19\)Apply the new addition for the fourth transition and round the final balance to cents
Common mistakes
Difficulty levels
Questions about this topic
What is the change-point balance?+
It is the balance reached at the end of the first stage, immediately before the new condition is applied
Why should the exact seam balance be carried forward?+
Rounding it before the second stage can alter later interest and cash-flow calculations, so rounding is postponed to the marked boundary
What is a counterfactual model?+
It is the balance that would result over the same periods if the original condition had continued without the stated change
Does a displayed $9500.00 prove that an exact balance reaches at least $9500?+
No. A value just below the target can round to the same cents display. Check the unrounded inequality and the adjacent permitted cent amount
Is preserving principal the same as preserving purchasing power?+
No. A constant nominal balance can lose purchasing power through inflation. Fees, changing rates and withdrawals can also invalidate a perpetual-payout model
Does the numerical answer choose a real financial product?+
No. These hypothetical comparisons omit contractual terms, fees, tax, risk and access restrictions. State those limits and do not treat a model result as a product recommendation
Can I use a calculator?+
A calculator is allowed unless a question is marked no calculator
Which year level and chapter is this?+
Year 12, VCE Units 3 & 4, General Mathematics, chapter 8: Cash flow and amortisation